Formation of a new concept Changing Places Toilet within the main Atrium at Medway Hospital.
The new facility is an upgrade on the normal disabled toilet footprint and is one of the first to be added to a hospital in Kent.
The project was originally going to be built in the Atrium but due to drainage issues site was moved to an office area and extended into the Atrium.
This required the installation of new structural steel work to allow the removal of an hour rated fire safety wall. As part of the project the emergency alarm was configured so that it repeats on the main switchboard to ensure that assistance teams can be notified and attend.
Client: Medway NHS Foundation Trust
Principle Contractor: G D Smy Limited
Duration: 8 weeks
Value: £75,000
Form of Contract: JCT Intermediate Building Contract with Contractor’s Design 2011
Recent Projects
Medway Maritime Hospital, Gillingham: Dolphin Ward
Princess Royal University Hospital, Bromley, Kent: NICU
Queen Marys Hospital Sidcup A Block Mammography Refurbishment
Queen Mary’s Hospital, Sidcup: New MRI Suite
Orpington Hospital, Kent: New Staff Wellbeing Hub
Medway Hospital, Gillingham: Changing Places Toilet
Mile End Hospital, London: Thames Ward Enabling Works
Queen Mary Hospital, Sidcup: Block A Enabling Works
